Pryme N.V.
Climate Impact & Sustainability Data (2023, 2024-07 to 2024-09, Q3 2023)
Reporting Period: 2023
Environmental Metrics
ESG Focus Areas
- Circularity
- Health, Safety, and Environment (HSE)
- Social Responsibility and Innovation
Environmental Achievements
- Successfully completed the construction of Pryme One, our first industrial-scale facility, in the port of Rotterdam.
- First oil production in January 2024
- First complete process cycle in February 2024
- Initiated batches of continuous production in April 2024
Social Achievements
- Health and safety standards consistently improved throughout the year.
- One incident involving an operator at an offsite event in the third quarter. The employee quickly recovered.
- Organization’s build-up reached 41.6 full-time equivalents (FTEs), successfully transitioning from a project-based setup to a production-oriented company.
- Established an internal HR department to implement HR related standards and initiatives and support the efforts to improve the gender mix.
Governance Achievements
- The 2023 financial statements were prepared by the Management Board and reviewed and discussed by the Supervisory Board at a meeting attended by the external auditor, Mazars.
- The Audit Committee discussed the financial statements and audit findings in detail with the external auditor in its meeting of March 15, 2024.
- The Supervisory Board adopted the financial statements in a Supervisory Board meeting on May 3, 2024.
Climate Goals & Targets
Medium-term Goals:
- Finalize site selections and launch the construction of new plants in the early 2025 timeframe
Short-term Goals:
- Establishing two or three commercial-scale facilities, with 120KT installations, in northwestern Europe.
Environmental Challenges
- Ongoing supply chain disruptions and labor shortages
- Specific technological hurdles like the unforeseen need of externalizing over a thousand heating ring connectors from our reactor
- Issues related to the design of the plant leading to time-consuming re-piping of certain sections of the plant.
- Issues relating to the performance of third-party components installed in the plant.
- Global challenges resulted in increased lead times for certain, mostly electronics-based components.
Mitigation Strategies
- Successful collaborations with technology partners
- Efficiently tested extruders converting plastic waste into melted plastic waste, secured all safety and operational standards for the condensation unit and 26-meter ground flare and seeded the quench column with a middle distillate starter fluid, required to condensate first oil production.
- Tackled multiple challenges, including reactor insulation and melt pipe pressure re-design changes, thanks to successful collaborations with our technology partners.
- Successfully completed the construction of Pryme One despite challenges.
Supply Chain Management
Responsible Procurement
- Partnered with existing waste processors to secure an adequate, ready-to-use feedstock.
Climate-Related Risks & Opportunities
Reporting Standards
Frameworks Used: IFRS Accounting Standards-EU, CSRD/ESRS, Sustainable Development Goals (SDGs)
Third-party Assurance: Mazars
Sustainable Products & Innovation
- Pyrolysis oil
Reporting Period: 2024-07 to 2024-09
Environmental Metrics
ESG Focus Areas
- Health and safety
- Environmental protection
- Cybersecurity
Environmental Achievements
- Received ISCC PLUS certification as a collection point and processing unit.
Social Achievements
- No safety incidents reported in Q3 2024.
- Cyber security risks assessed and documented. Cybersecurity awareness training scheduled for Q4.
Governance Achievements
- Close oversight of the company by the chairman of the supervisory board during CEO transition.
Climate Goals & Targets
Short-term Goals:
- Achieve production volumes at or near full capacity by the end of 2025.
Environmental Challenges
- Slower than anticipated production ramp-up at Pryme One due to process layout and oil yield levels, resulting in lower plant availability and capacity than previously assumed.
- Fluctuating production output impeding mass balance calculations and Life Cycle Analysis update.
- Limited storage capacity for pyrolysis oil requiring temporary rental of additional tank storage.
Mitigation Strategies
- Established an expert group to accelerate production ramp-up by identifying areas for improvement and implementing changes.
- Postponed Life Cycle Analysis update until stable production conditions are established.
- Temporarily renting additional tank storage capacity for pyrolysis oil.
Supply Chain Management
Climate-Related Risks & Opportunities
Reporting Standards
Frameworks Used: ISCC PLUS
Certifications: ISCC PLUS (processing unit and collection point)
Reporting Period: Q3 2023
Environmental Metrics
Total Carbon Emissions:Not disclosed
Scope 1 Emissions:Not disclosed
Scope 2 Emissions:Not disclosed
Scope 3 Emissions:Not disclosed
Renewable Energy Share:Not disclosed
Total Energy Consumption:Not disclosed
Water Consumption:Not disclosed
Waste Generated:40,000 tons plastic waste expected through one reactor (Pryme One)
Carbon Intensity:Not disclosed
ESG Focus Areas
- Circular economy
- Waste reduction
- Emissions reduction
Environmental Achievements
- Successfully tested both extruders from waste to melt at Pryme One.
- Reactor reached targeted 600°c and 30 rpm.
Social Achievements
- One safety incident during an off-site activity; operator fully recovered.
- 35 FTE headcount; installation manned 24/7 since early October 2023.
Governance Achievements
- Not disclosed
Climate Goals & Targets
Long-term Goals:
- Not disclosed
Medium-term Goals:
- Construction and commissioning of Pryme Two and Pryme Three.
Short-term Goals:
- Raise up to €12 million to fund post-startup process & technology developments, permitting & rollout activities for Pryme Two & Three.
Environmental Challenges
- Corrective actions needed for Pryme One commissioning (estimated 4-6 weeks).
- Pipe pressure upgrading and re-certification required for extruder units.
- 500 heating rings/wiring connectors need adjustment on the reactor.
Mitigation Strategies
- Streamlined experienced technical team troubleshooting issues.
- Corrective actions underway to address issues with extruders and reactor.
Supply Chain Management
Supplier Audits: Not disclosed
Responsible Procurement
- Integrating into existing waste management supply chains.
Climate-Related Risks & Opportunities
Physical Risks
- Not disclosed
Transition Risks
- Not disclosed
Opportunities
- Not disclosed
Reporting Standards
Frameworks Used: Null
Certifications: Null
Third-party Assurance: Not disclosed
UN Sustainable Development Goals
- Not disclosed
Not disclosed
Sustainable Products & Innovation
- Liquefied plastic waste (LPW)
Awards & Recognition
- Not disclosed