Environmental Achievements

  • Successfully completed the construction of Pryme One, our first industrial-scale facility, in the port of Rotterdam.
  • First oil production in January 2024
  • First complete process cycle in February 2024
  • Initiated batches of continuous production in April 2024

Social Achievements

  • Health and safety standards consistently improved throughout the year.
  • One incident involving an operator at an offsite event in the third quarter. The employee quickly recovered.
  • Organization’s build-up reached 41.6 full-time equivalents (FTEs), successfully transitioning from a project-based setup to a production-oriented company.
  • Established an internal HR department to implement HR related standards and initiatives and support the efforts to improve the gender mix.

Governance Achievements

  • The 2023 financial statements were prepared by the Management Board and reviewed and discussed by the Supervisory Board at a meeting attended by the external auditor, Mazars.
  • The Audit Committee discussed the financial statements and audit findings in detail with the external auditor in its meeting of March 15, 2024.
  • The Supervisory Board adopted the financial statements in a Supervisory Board meeting on May 3, 2024.

Climate Goals & Targets

Medium-term Goals:
  • Finalize site selections and launch the construction of new plants in the early 2025 timeframe
Short-term Goals:
  • Establishing two or three commercial-scale facilities, with 120KT installations, in northwestern Europe.

Environmental Challenges

  • Ongoing supply chain disruptions and labor shortages
  • Specific technological hurdles like the unforeseen need of externalizing over a thousand heating ring connectors from our reactor
  • Issues related to the design of the plant leading to time-consuming re-piping of certain sections of the plant.
  • Issues relating to the performance of third-party components installed in the plant.
  • Global challenges resulted in increased lead times for certain, mostly electronics-based components.
Mitigation Strategies
  • Successful collaborations with technology partners
  • Efficiently tested extruders converting plastic waste into melted plastic waste, secured all safety and operational standards for the condensation unit and 26-meter ground flare and seeded the quench column with a middle distillate starter fluid, required to condensate first oil production.
  • Tackled multiple challenges, including reactor insulation and melt pipe pressure re-design changes, thanks to successful collaborations with our technology partners.
  • Successfully completed the construction of Pryme One despite challenges.

Supply Chain Management

Responsible Procurement
  • Partnered with existing waste processors to secure an adequate, ready-to-use feedstock.

Climate-Related Risks & Opportunities

Reporting Standards

Frameworks Used: IFRS Accounting Standards-EU, CSRD/ESRS, Sustainable Development Goals (SDGs)

Third-party Assurance: Mazars

Sustainable Products & Innovation

  • Pyrolysis oil

Reporting Period: 2024-07 to 2024-09

Environmental Metrics

ESG Focus Areas

  • Health and safety
  • Environmental protection
  • Cybersecurity

Environmental Achievements

  • Received ISCC PLUS certification as a collection point and processing unit.

Social Achievements

  • No safety incidents reported in Q3 2024.
  • Cyber security risks assessed and documented. Cybersecurity awareness training scheduled for Q4.

Governance Achievements

  • Close oversight of the company by the chairman of the supervisory board during CEO transition.

Climate Goals & Targets

Short-term Goals:
  • Achieve production volumes at or near full capacity by the end of 2025.

Environmental Challenges

  • Slower than anticipated production ramp-up at Pryme One due to process layout and oil yield levels, resulting in lower plant availability and capacity than previously assumed.
  • Fluctuating production output impeding mass balance calculations and Life Cycle Analysis update.
  • Limited storage capacity for pyrolysis oil requiring temporary rental of additional tank storage.
Mitigation Strategies
  • Established an expert group to accelerate production ramp-up by identifying areas for improvement and implementing changes.
  • Postponed Life Cycle Analysis update until stable production conditions are established.
  • Temporarily renting additional tank storage capacity for pyrolysis oil.

Supply Chain Management

Climate-Related Risks & Opportunities

Reporting Standards

Frameworks Used: ISCC PLUS

Certifications: ISCC PLUS (processing unit and collection point)

Reporting Period: Q3 2023

Environmental Metrics

Total Carbon Emissions:Not disclosed
Scope 1 Emissions:Not disclosed
Scope 2 Emissions:Not disclosed
Scope 3 Emissions:Not disclosed
Renewable Energy Share:Not disclosed
Total Energy Consumption:Not disclosed
Water Consumption:Not disclosed
Waste Generated:40,000 tons plastic waste expected through one reactor (Pryme One)
Carbon Intensity:Not disclosed

ESG Focus Areas

  • Circular economy
  • Waste reduction
  • Emissions reduction

Environmental Achievements

  • Successfully tested both extruders from waste to melt at Pryme One.
  • Reactor reached targeted 600°c and 30 rpm.

Social Achievements

  • One safety incident during an off-site activity; operator fully recovered.
  • 35 FTE headcount; installation manned 24/7 since early October 2023.

Governance Achievements

  • Not disclosed

Climate Goals & Targets

Long-term Goals:
  • Not disclosed
Medium-term Goals:
  • Construction and commissioning of Pryme Two and Pryme Three.
Short-term Goals:
  • Raise up to €12 million to fund post-startup process & technology developments, permitting & rollout activities for Pryme Two & Three.

Environmental Challenges

  • Corrective actions needed for Pryme One commissioning (estimated 4-6 weeks).
  • Pipe pressure upgrading and re-certification required for extruder units.
  • 500 heating rings/wiring connectors need adjustment on the reactor.
Mitigation Strategies
  • Streamlined experienced technical team troubleshooting issues.
  • Corrective actions underway to address issues with extruders and reactor.

Supply Chain Management

Supplier Audits: Not disclosed

Responsible Procurement
  • Integrating into existing waste management supply chains.

Climate-Related Risks & Opportunities

Physical Risks
  • Not disclosed
Transition Risks
  • Not disclosed
Opportunities
  • Not disclosed

Reporting Standards

Frameworks Used: Null

Certifications: Null

Third-party Assurance: Not disclosed

UN Sustainable Development Goals

  • Not disclosed

Not disclosed

Sustainable Products & Innovation

  • Liquefied plastic waste (LPW)

Awards & Recognition

  • Not disclosed