Ready Set Gold Corp.
Climate Impact & Sustainability Data (2022)
Reporting Period: 2022
Environmental Metrics
Social Achievements
- Backfilling of the Northshore No. 4 shaft to address public safety hazard.
Climate Goals & Targets
Medium-term Goals:
- 2,000 m of drilling at the Afric Zone and Gino Vein areas (Phase 2), dependent on Phase 1 results and geological model development.
Short-term Goals:
- Re-logging and sampling of historical drill core, density measurements and collar surveys, geological modelling, and community and First Nations consultations (Phase 1).
Environmental Challenges
- Lack of detailed geological data in the electronic database.
- Inconsistent geological coding in the database.
- Limited number of bulk density measurements and lack of documentation on their origin.
- Unsampled intervals within the mineralization domain.
- Unavailability of QA/QC data prior to 2011 and for 2017-2018 drilling.
- Inconsistency in analytical techniques between different laboratories used over the project's lifetime.
Mitigation Strategies
- Assigned a nominal default waste value of 0.005 ppm Au to unsampled intervals.
- Used a global bulk density of 2.7 t/cm³ based on existing measurements.
- Resampling of previously unsampled core intervals to improve data.
Supply Chain Management
Climate-Related Risks & Opportunities
Reporting Standards
Frameworks Used: NI 43-101, CIM Best Practices and Reporting Guidelines