  • Lower silver prices resulted in the mine being put on care and maintenance in December 2013.
  • The mill failed to reach design production rates and projected silver recovery in 2012-2013.
  • Unreliable resource model for estimating mineralization extent, complexity, and location.
  • Mill assembled partly from used equipment unsuitable for design parameters.
Mitigation Strategies
  • New metallurgical test work and information on Shafter deposit, Presidio Mine operation, and recent Aurcana operation used to create a new mine model and refine the mill feed processing flowsheet.
  • Proposed activities to advance the Shafter project include cavity survey of Presidio workings, plan to improve definition of remaining Presidio mineralization, mapping Presidio workings, drilling to test zones, re-examining historic drill-hole data, updating the database, re-examining historic information, developing an accurate survey of land holdings, metallurgical testing, equipment inspection, thickener evaluation, and completing a pre-feasibility or feasibility study.

Supply Chain Management

Climate-Related Risks & Opportunities

Reporting Standards

Frameworks Used: NI 43-101, CIM Standards

Reporting Period: 2018

Environmental Metrics

Total Carbon Emissions:Not disclosed
Scope 1 Emissions:Not disclosed
Scope 2 Emissions:Not disclosed
Scope 3 Emissions:Not disclosed
Renewable Energy Share:Not disclosed
Total Energy Consumption:Not disclosed
Water Consumption:Not disclosed
Waste Generated:Not disclosed
Carbon Intensity:Not disclosed

ESG Focus Areas

  • Environmental
  • Social
  • Governance

Environmental Achievements

  • Reclamation of tailings disposal area and mill bleed water pond, qualifying as exempt from hazardous designation pursuant to the Bevill Amendment.

Social Achievements

  • Not disclosed

Governance Achievements

  • Not disclosed

Climate Goals & Targets

Long-term Goals:
  • Not disclosed
Medium-term Goals:
  • Drill 16 holes to test the zone east of mine-grid 53,750.
  • Update the database with historic channel-sample information and re-sample some locations to confirm historic results.
Short-term Goals:
  • Rehabilitate existing workings and complete a cavity survey of the Presidio workings.
  • Develop a plan to improve the definition of the remaining Presidio mineralization.
  • Complete geotechnical investigations to establish design stope dimensions and a ground control management plan.
  • Complete hydrogeological investigations to determine expected water inflow by mine area.

Environmental Challenges

  • Lower silver prices resulted in the mine being put on care and maintenance in December 2013.
  • Design silver production rates were not met during 2012-2013 operations.
  • Unreliable resource model for estimating mineralization extent, complexity, and location.
  • Mill assembled partly from used equipment not fully suitable for design parameters.
Mitigation Strategies
  • Updated mine plan incorporating updated costs.
  • Recommended work program to upgrade inferred resources, including rehabilitation of workings, cavity surveys, geotechnical and hydrogeological investigations, drilling, and data updates.
  • Metallurgical testwork to optimize and confirm whole-ore leach recoveries.

Supply Chain Management

Supplier Audits: Not disclosed

Responsible Procurement
  • Not disclosed

Climate-Related Risks & Opportunities

Physical Risks
  • Not disclosed
Transition Risks
  • Not disclosed
Opportunities
  • Not disclosed

Reporting Standards

Frameworks Used: NI 43-101, CIM Standards

Certifications: Null

Third-party Assurance: Not disclosed

UN Sustainable Development Goals

  • Not disclosed

Not disclosed